Composite

Part:BBa_K102121

Designed by: Wayne Materi   Group: iGEM08_Alberta_NINT   (2008-10-27)

The output test harness provides a means to visibly detect when a gate is activated. It consists of a Lac promoter (which is induced by IPTG throughout the test to act as a constitutive promoter) followed by the gate then an RBS and LacZα. In order to test activity the activation of the gate by its correct input is compared to that from a “null” input using a standard LacZ assay.

[edit]
Categories
Parameters
None